How long does a custom furniture order from China take?
Start with the production schedule, then plan freight separately. A production lead time is not an arrival date for your restaurant or hotel.
Short answer
Typical production takes 15–20 days, depending on quantity. The schedule for your order is confirmed in your quotation.
Custom details can take longer: in a completed project for a client in France, seating took about 25 days and the extending sintered-stone table about 45 days. These are factory lead times on EXW terms, excluding sea freight and customs clearance.
From your reference to EXW collection
| Step | Who handles it | How long |
|---|---|---|
| Send drawings or reference images | You | Confirmed in your quotation |
| First quotation after we receive references, quantities and destination | Foshan Seating | Within 48 hours |
| Confirm specifications in writing, including upholstery | You + Foshan Seating | Confirmed in your quotation |
| Production | Foshan Seating | Typically 15–20 days, depending on quantity; confirmed in your quotation |
| Review product photos before shipping, if requested | You + Foshan Seating | Confirmed in your quotation |
| Pack in cartons or wooden frames | Foshan Seating | Confirmed in your quotation |
| EXW collection at the factory | You / your appointed carrier | Confirmed in your quotation |
The first quotation is not the production start. Confirm the production start date and EXW readiness date in writing. Product photos can be shared for review before shipping.
Two real examples: complexity and material choice
A completed project for a client in France
Production took about 25 days for the dining chairs, bar stools, lounge chair and sectional sofa. The extending sintered-stone table took about 45 days. The order was made and delivered. The table required more time than the seating; one schedule did not fit every item.
See the completed France project and product photos ↗
A client from Vietnam chose a specific upholstery
The client selected orange-brown microfiber leather from a supplier’s color card for model 22205. We quoted using that material. When you specify a material, it needs to arrive before upholstery work can proceed. Confirm its availability before agreeing to a production schedule; this example does not establish a standard lead time.
See the Vietnam material-selection case ↗ and the 22205 upholstery options ↗.
What can extend the lead time?
- Custom tabletops and extension mechanisms. The France project’s extending sintered-stone table took about 45 days; confirm the schedule for your exact table.
- Specified upholstery. A supplier’s material must be available and received before it can be used.
- Quantity. The usual 15–20-day production window depends on the size of the order.
How to avoid preventable delays
Choose the upholstery early. Send the supplier’s material reference and color code together, rather than confirming the chair first and deciding the cover later.
Send one complete list: drawings or reference photos, model, dimensions, material, color and quantity for each item, destination, and carton or wooden-frame packing. Put any stone finish or extension mechanism on that list. Confirm the specifications in writing before production.
For what to put on that list, see our order checklist ↗. For a mixed list, see our guide to mixing colors and models ↗. For a project brief, see how we work with designers ↗.
Plan sea freight and customs separately
These are factory lead times for EXW collection. They do not include sea freight or customs clearance. Ask your freight provider for a separate transport schedule before setting an opening date. Do not treat the usual production window as a delivery-to-site promise.
Questions before you request a quote
Does 15–20 days include shipping?
No. It is the typical production window, depending on quantity. EXW factory collection, sea freight and customs clearance must be planned separately.
When will I receive the first quotation?
Within 48 hours after we receive drawings or reference images, quantities and the destination. Specifications and the production schedule still need to be confirmed.